Services

Off-site Activities

Project Division of Prestige Engineering L.L.C. is specialized in undertaking Site activities including shutdowns and maintenance services.

With the aid of our excellent planning team, which controls the execution with appropriate schedules, accurate resources and contingency plans to ensure all the activities are within the schedule and budget.

With a talented and well-managed workforce, we are confident in taking up any type of Off-site activities from our clients.

Re-tubing Of Shell and Tube Exchangers and Boilers.

Heat Exchangers are being used in the Oil and Gas industry often have corrosive and viscid fluids and gases flowing through its tubes. As heat exchanger’s age, their performance declines overtime, due to fouling, erosion and corrosion, thus requiring periodic refurbishment and repair. An effective and cost efficient solution is re-tubing of the exchanger.

Prestige Engineering is specialized in re-tubing services and associated works with re-tubing such as Exchanger blinding, Tube bundle extraction, on-site/off-site re-tubing, bundle installation, testing and commissioning.

  • Major Projects Executed
  • Dismantling of existing plant at location, installation of 120 TPD air separation plant for emirates industrial gases co LLC at Dubai, RAK for Guardian Glass Manufacturing Company.
  • Installation of new 57TPD Air separation plant at Libya for Al Libya Manufacturing of industrial & synthetic Gases.
  • Replacement (Erection and Commissioning) of Pressure Vessels and Heat Exchangers during Turn-around.
  • Re-positioning of Valves and manufacture, erections and Testing of Complete associated piping in ADNOC Refining in Ruwais.
  • Repair of Production separators in live plant ADNOC-Onshore
  • Repair of Sulphur condensers and Suction separators in ADNOC-LNG during Turnaround.
  • Repair of HP section knob out –drawn as per ASME/NB regulations for Man Diesel & Turbo at Aqaba, Jordan.
  • Off site lining by Gunning/brick works during Turnaround in Emirates steel- Furnace Chambers.
  • Off site section lining work by Gunning at SEWA for Stacks,